Hello PDF

ELASTOPHENE® FLAM 25 AR T3 is a SBS elastomeric bitumen waterproofing membrane with a glass grid / glass fleece reinforcement. The topside is protected . ELASTOPHENE® 25 AR must be applied by torch-on techniques on a weldable underlayer (FLAM) or bonded with bitumen (EAC free of oxidized bitumen) on a. ELASTOPHENE® FLAM is a flexible SBS elastomeric bitumen waterproofing membrane with a non-woven polyester reinforcement. Both sides are.

Author: Negul Taugar
Country: Egypt
Language: English (Spanish)
Genre: Marketing
Published (Last): 10 April 2007
Pages: 138
PDF File Size: 14.48 Mb
ePub File Size: 5.56 Mb
ISBN: 444-8-53130-452-8
Downloads: 47658
Price: Free* [*Free Regsitration Required]
Uploader: Vozuru

Welding the outer reinforcement onto the collector. Finishing around rain water collector See 2.

ELASTOPHENE® FLAM 70-25

Cinq points de Sopracolle par plaque. Pas une goute n’entre dans la maison.

Since the new waterproofing and the insulation will raise the roof, the rainwater drains must also be raised. L’isolation Knauf Thane ET. Rodolphe Ferracane, e-mail contact AFR-etancheite.

ELASTOPHENE FLAM – Soprema

The joint of the flat roof and the rising walls that surround the elasstophene are a possible source of leaks. La partie bitume fait approximativement 2. The collector is trimmed before applying the outer reinforcement. The rain water collector will pass through this. The rain water collector is positioned through a hole cut in the sidewall reinforcement, and then heated to glue it to the sidewall.

The work specified by this standard is often referred to as Three layers plus insulation, with heated reinforcement. Before work begins, the existing concrete surface was cleaned with a high pressure bar hose equipped with a rotating jet. Reinforcement at junction of standups. The photos on this page describe the work. Cliquer sur les photos pour elastophdne agrandir. Soudage du renfort sur platine et dalle. Finition autour de la platine. Click on the photos to enlarge them.

  HOLGER BABINSKY PDF

The figure shows the three layers and the sidewall reinforcement for each layer.

ELASTOPHENE® 25 AR

These are ajusted now but will be fitted later taking into account the future height of the finished surface. The Ealstophene 25 is rolled out and cut to fit. The top serface is covered with flakes of stone which protect it against the ultra-violet.

Because there are few right angles, there are lots of triangles to be filled in. When reading estimates for waterproofing on flat roofs you may find that the estimate is lightened to reduce the price. Before the insulation is laid, the channels carrying the rain water are reinforced: Heating the outer-reinforcement and the collector.

Last drops of the weekend’s heavy rain. Removal of remnants of previous waterproofing. Creative Commons Attribution – Pas de Modification 3. If there is a risk of rain, then the Knauf Thane ET glued to the first layer must be entirely enclosed by the second layer, even if this means performing work not needed by the final waterproofing. Chauffage du sur-renfort et de la platine.

On my roof, the rolls of the final layer elastphene positioned north-south, so the second layer must be east-west. The first layer and the sidewall reinforcement are complete after 4 days. This second layer of bitumen should be placed on the Knauf Thane ET within a few hours to ensure that the Sopracolle glue speads out under the pressure of the layer of bitumen above.

  ANALYSE TRANSACTIONNELLE ERIC BERNE PDF

Bitumous glue is applied to the rising side walls. For ealstophene the first layer could be omitted, and the insulation glued directly to the existing surface. The third bitumous layer is a reinforced bitumen with its lower face covered by a film which melts when heated, gluing it to the second layer. It prevents water vapour reaching the insulation, and serves as a base for the finishing layer.

Creative Commons Attribution – NoDerivs 3. Fitting the 2nd layer in front of the future rain collector. Click on photo to enlarge. As with the 1st layer, the joint of the flat roof and the rising walls that surround the roof are a possible source of leaks. Il est bien plus rapide de remplacer les renforts par le flashing: The weekend brings heavy rain to test the waterproofing — not a drop gets through to the house.